Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2448.7
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Sep 05, 2023     firewall Insulation and passthrough - (6 hours)       Category: Firewall
Installed additional passthrough. Defined position for Main Passthrough and ANL / SHUNT.
Decided to trim the fiberfrax to allow direct riveting of oil cooler mount to the firewall. Trimmed fiberfrax to allow direct contact of engine mount to the firewall.
Fiberfrax should not be sandwiched between riveted items as with vibration the fiberfrax loosen up and rivets are not holding tight.


 